Patent pending EN 1443 · EN 13084-7 · NFPA 211 Engineering enquiries answered within two working days
engineering@exostack.com
EXOSTACK Modular exhaust stacks
Exostack/Economics

Roughly half the saving is work that never happens

Exostack hardware is genuinely cheaper than an insulated stainless stack. But the larger part of the difference is not hardware at all — it is the crane, the secondary steelwork, the extra site visits and the permits that a 900 kg stack drags along behind it. Below is the whole build-up, on both sides, with nothing rolled into a lump sum.

Cost model

Price your own installation

Set the geometry and the roof, choose what you are comparing against, and the model rebuilds both estimates line by line. It runs in your browser — nothing is sent anywhere.

Installed cost estimator

2025 German market rates · indicative, not a quotation

Runs locally

Measured from the roof deck to the head of the stack.

Nominal bore of the flue path.

Exostack duct specification

Not sure? Three questions will tell you.

Comparing against
Roof construction

On a concrete or steel-frame deck the rigid stack may not need reinforcement, so the model removes it. The saving drops, and it is still substantial.

Saving on this installation
€70,500

85% less than double-wall insulated stainless 316L, delivered and installed.

Exostack, installed€12,500
Rigid stack, installed€83,000
Exostack over 20 years€17,600
Rigid stack over 20 years€91,000

Get this checked by an engineer

Exostack — line by line

Rigid stack — line by line

Reference case

Where the money actually goes

A 7 m × 1,000 mm stack on trapezoidal steel sheet decking, the most common industrial rooftop situation in Europe. Both bars are drawn to the same scale.

Double-wall insulated stainless 316LCE marked, 50 mm insulation, crane erected
€84,650
Supply €47,950
Crane
Reinforcement €19,500
Labour
Exostack Option BPTFE / PVDF duct, two engineers, one visit
€12,503
Skeleton
Duct
Stack supply / skeleton Fabric duct Crane operation Roof reinforcement Engineering and permits Installation labour Guys, anchors, delivery
€72,150

Saved on this reference installation — an 85% reduction on delivered project cost. Two thirds of it is hardware; the rest is crane, secondary steelwork, extra site visits and permits that simply never enter the programme.

€0 crane €0 reinforcement One site visit Two people

The line most projects underestimate

Roof reinforcement is €19,500 on this reference case and it is almost never in the first budget, because it only appears once a structural engineer has looked at the deck. On trapezoidal sheet it is the single largest surprise in a conventional stack project, and on Exostack it does not exist — the guy wires spread the wind moment across three anchor points instead of concentrating it at a base plate.

Where the comparison narrows

On a concrete deck that needs no reinforcement, and against a single-wall rather than insulated stack, the gap closes considerably. Set the calculator above to that case and you will see it honestly: the saving is smaller, and it is still worth having. We would rather you found that out here than felt misled later.

Twenty-year view

Counting the duct replacement, because it is real

An Option B duct lasts 12 to 18 years, so a 20-year horizon usually includes exactly one replacement. That is a planned four-hour job on a skeleton that stays standing, and we put it in the total rather than leave you to discover it.

The honest comparison on the other side is not a stack that needs nothing for 20 years either. Rigid stainless typically wants relining or recoating around year 12, and that means a crane, a shutdown and a five-figure invoice.

How a duct swap works
Reference case, 7 m × 1,000 mm on trapezoidal decking, Exostack Option B against double-wall insulated 316L. Figures exclude inflation and discounting.
Over 20 yearsRigid 316LExostack B
Initial installation€84,650€12,503
Duct replacement, year 15€5,028
Reline or recoat, year 12€8,000Not required
Crane for mid-life workIncluded aboveNot required
Production downtime2–3 days4 hours
Annual inspectionSpecialist visit30 min, in-house
Twenty-year total€92,650€17,531

Change the process and the sum changes again

If you switch fuel or add a scrubber inside those 20 years, the rigid stack is often wrong for the new flue chemistry and has to be replaced outright. Exostack takes a different duct on the same skeleton for the price of the duct.

Method

Where these numbers come from

An 85% saving is a large claim and you are right to interrogate it. Here is the basis, so you can check it against your own quotations rather than take ours.

Basis 01

Engineered product prices, not material cost

The stainless figures are supply prices for CE-marked, insulated double-wall stack from established European manufacturers — what a contractor actually invoices. They are not raw 316L tonnage rates, which would understate the comparison and flatter us.

Basis 02

2025 German contractor rates

Crane hire, rigging, structural steelwork and installation labour are verified 2025 rates for the German market. Rates in other European markets and the United States differ, sometimes materially, and we re-run the model per project.

Basis 03

One reference geometry

Everything is normalised to 7 m × 1,000 mm on trapezoidal sheet, then scaled: skeleton cost with height and diameter, duct with developed area, reinforcement with system weight. The calculator applies the same scaling you see here.

Basis 04

Costs we have left out

No allowance for road closure, out-of-hours working, scaffolding or production downtime during a conventional install — all of which are real, all of which favour Exostack, and none of which we have counted.

Basis 05

What is genuinely uncertain

Coated fabric pricing spans a wide range by source and grade, which is why replacement costs are quoted as ranges rather than points. Reinforcement cost varies with the specific deck and frame more than any other line.

Disagree with a number?

Send us the quotation

If you hold a real quotation that contradicts a figure on this page, we want to see it. Either it improves our model or it tells us something about your market we did not know. Both are worth more to us than being right.

Send it to engineering
Next step

Turn the estimate into a real number

The calculator gets you within a working range. To get a figure you can put in a budget submission we need the stream, the geometry and a look at your roof — which is four short steps and a two-day turnaround.

ReplyWithin two working days, from an engineer rather than a mailbox
You getAn indicative installed price with the line-item build-up behind it
CostNothing, and no obligation
Which duct? Request a quote